[1] Construction of this power station began in October 1994 and was completed and started producing electricity in December 1997.
[4] The Combined cycle gas turbine power station is located on Willows Business Park, Saddlebow, King's Lynn and uses gas from National Grid's National Transmission System.
The station was built with one single shaft 237 MW Siemens V94.3 Gas driven Turbine with electrical generator running at 3,000 rpm.
There is a vertical type triple pressure heat recovery steam generator designed by CMI SA (Belgium)and supplied by CMI SA and International Combustion (since 1997 known as ABB Combustion Services Ltd.
The plant was built with one air cooled condenser which compromises of 61 cooling modules of fins, tubes and fan arranged in four by four configuration, connected to the 132 kV electrical distribution system.