Kirkuk–Ceyhan Oil Pipeline

Usable capacity of the line is believed to be only 300 thousand barrels per day (~1.5×10^7 t/a), with significant repairs still required.

[3] On 16 August 2013, at around 0100 GMT near the al-Shura area 60 km to the south of the city of Mosul a bomb attack damaged the pipeline.

[4] On 3 September 2013, at around 0200 GMT near Ein al-Jahash area, a bomb attack damaged the pipeline.

[5] In 2013, the Kurdistan Regional Government of Iraq completed a pipeline from the Taq Taq oil field through Khurmala (the northwest sector dome of the greater Kirkuk field) and Dahuk to Pesh Khabur (Fesh Khabur) on the Turkey-Iraq border, where it is connected to the Kirkuk-Ceyhan pipeline.

[6] On 23 May 2014, the Kurdistan Regional Government announced that the first oil transported via the new pipeline was loaded into a tanker at Ceyhan.