Qvist & Gjers designed, engineered, and built the plant with two turbine-generator units totaling 400 kW, along with extra space for two more should they be needed in the future.
[3][4] Due to financial constraints and the so-called kungsådra (an old law preventing part of the waterways from being blocked), the whole stream was not dammed.
This was due to the plant's location at the lower part of the stream, between Norrfors and Klabböle, where the water cools off to the point that it becomes supercooled.
Meanwhile, the Umeå municipality wanted the state-owned company Vattenfall to start constructing a power plant in Norrforsen, which they were told would happen.
The older machinery was retained and has been incorporated into a power plant museum, as part of the Umeå Energy Centre.