Kochi Bypass

Space crunch has really started to take a toll on the MG Road, and the NH Bypass provides answer to all the problems faced by the former.

According to a survey conducted in 2016, Edappally-Aroor National Highway stretch carries over 77,000 passenger car units daily.

A detailed project report (DPR) is being readied on how to decongest the stretch which carries over 77,000 passenger car units (PCUs) daily.

An ideal way according to N.H.A.I to decongest the ever-busy stretch that carries inter and intra-State vehicles, which include national permit, container, tipper and tanker lorries, is to build a four-lane elevated highway.

The NHAI has proposed to take a final decision after Feedback Infra Private Limited submits its DPR shortly on developing the stretch.

Kochi Bypass at Thykoodam
Kochi Bypass near Vyttila
A panoramic view of Vyttila Mobility Hub