T2 (Tram İzmir)

The line serves 19 stations and began operating on 24 April 2018.

[1][2] The tram line runs between Fahrettin Altay Square, Konak and Halkapınar.

It is part of the Karşıyaka and Konak Tram project of İzmir Metropolitan Municipality, which cost nearly ₺ 450 million (approx.

The tramcars run on standard track gauge at 1,435 mm (4 ft 8+1⁄2 in).

The line has a communications-based train control (CBTC) signalling system.