Kuala Lumpur–Rawang Highway

The most controversial development of the FT1 highway in Kuala Lumpur was the toll collection at Jalan Kuching FT1.

The nine-year concession of Jalan Kuching FT1 was awarded to Kamunting Corporation Berhad, signed on 15 April 1985.

In the original concessionaire agreement, Kamunting Corporation Berhad was required to build an interchange at Kepong Roundabout and to upgrade the Jalan Kepong FT54, in return for the nine-year toll collection rights starting from 1987 until 1996.

The project was led by Malaysian Public Works Department (JKR), Kuala Lumpur City Hall (DBKL) and the main contractor was Ahmad Zaki Resources Berhad (AZRB).

The 2-lane single-carriageway section between Bandar Baru Selayang and Templer's Park was upgraded to 4-lane dual-carriageway with emergency lanes and several U-turns.