Lakeside and Haverthwaite Railway

The FR branch trains travelled east to the triangular junction at Plumpton, then turned north via Greenodd and on to stations at Haverthwaite, Newby Bridge halt and Lakeside.

During the summer season, excursion trains from Lancashire and elsewhere used the east-to-north side of Plumpton Junction to reach Lakeside, where their passengers joined the boat sailings on the lake.

[2] A group of enthusiasts, chaired by Dr Peter Beet, formed the Lakeside Railway Estates Company; they had the idea of preserving both the line and the former LMS 10A locomotive shed at Carnforth, to provide a complete steam operating system.

However, although backed by then transport minister Barbara Castle, the need to build a number of motorway bridges and rerouting of the A590 road from Haverthwaite via Greenodd to Plumpton Junction, meant that the complete vision was unsuccessful.

The venture folded as a public access visitor attraction in 1997, but the preserved site was taken over by businessman David Smith to become the base for his West Coast Railway Company.

Download coordinates as: Information below derived from the Lakeside and Haverthwaite Railway Visitors Guide sixth edition and the IRS reference book.