Leipzig Hbf–Leipzig-Connewitz railway

As a result, the link from Leipzig Hauptbahnhof to the Royal Saxon State Railways line at Connewitz was opened on 20 August 1878.

The main reason for this is the avoidance of the costs of the otherwise necessary reconstruction of dilapidated bridges in Stötteritz and Sellerhausen.

Due to necessary construction works before opening the tunnel and to connect it to the existing railway network the line has already been closed for good between Leipzig Hbf and Leipzig-Stötteritz on November 24, 2012.

All passenger traffic on the line between Gaschwitz, Leipzig-Connewitz and Leipzig Hauptbahnhof travels via the City Tunnel.

Therefore, the former station at Leipzig-Marienbrunn was not reopened, the section between Tabakmühle junction and Leipzig-Connewitz remains for freight traffic only.