The first phase of the line, spanning 23.55 km (14.63 miles) from Kaifu District Government to Shangshuangtang, commenced construction work on December 26, 2010.
Excavation work was completed in October 2015,[1] and the section was opened on June 28, 2016.
[2] A 5-station, 9.88 km long extension north to Caixia Road from Kaifu District Government began construction on October 16, 2020.
[4] Services on the line are provided by a fleet of 23 Type B train sets manufactured by CRRC Zhuzhou.
These train sets run in a six-car formation and have a top speed of 80 km/h (50 mi/h), and have double-layered flooring installed for noise reduction and improved passenger comfort.