The total length of the line is planned to be 22.17 kilometres (13.78 mi), and the route will be completely elevated.
The total cost of construction is confirmed to be Rs 2037.20 crore.
[3] However the construction work is yet to start and is expected to be completed on 2026 with Revenue Opening Date (ROD) as 01/11/2024.