Line 5 (Changsha Metro)

Line 5 of the Changsha Metro (Chinese: 长沙地铁五号线; pinyin: Chǎngshā Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Changsha.

[2][3] Construction started on the line in November 2015, with trial running beginning on 30 December 2019.

The line was opened to the public on 28 June 2020.

[3] The line is operated by 14 six-car Type B trainsets with permanent-magnet traction motors.

This Chinese rapid transit article is a stub.