Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Chengdu.
It starts at Huagui Road and ends at Huilong.
This line began construction on 14 September 2015,[1] was opened on 27 December 2019, from Huagui Road to Huilong.
Originally, the line was planned to use 6-car Type A rolling stock.
[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.