Line 5 (Chengdu Metro)

Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Chengdu.

It starts at Huagui Road and ends at Huilong.

This line began construction on 14 September 2015,[1] was opened on 27 December 2019, from Huagui Road to Huilong.

Originally, the line was planned to use 6-car Type A rolling stock.

[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.