List of Dhaka Metro Rail stations

It is owned and operated by the Dhaka Mass Transit Company Limited.

[1] Together with a proposed subway system it is expected to reduce traffic congestion in the city.

[3][4] The construction of MRT Line 6's second section is scheduled to be completed during 2023.

[6][7][8] Further expansion of MRT Line 6 is planned, with the hope of extending it towards Tongi in Gazipur metropolitan and Savar Upazila.

The fares range from minimum ৳20 to maximum ৳100 (for MRT line 6).