The farm has a maximum output of 194MW from 54 Siemens Wind Power 3.6-107 turbines with a generating capacity of 194 MW.

[2] In 2003 Centrica Renewable Energy acquired the Lynn and the Dowsing wind farm projects and merged them into a single development.

[12] In early 2016 Centrica and EIG Global Energy Partners agreed to sell the wind farm to a consortium (Green Investment Bank 51% and BlackRock 49%).

The sale including the 26MW onshore Glens of Foudland wind farm was valued at c. £423 million.

[15][16] In 2012 Centrica established a maintenance base for the wind farm at No.3 Fish Dock at the Port of Grimsby.

[20] In 2014 Cofely Fabricom GDF Suez was awarded the contract to carry out grouting repairs and structural modifications on the turbine foundations.