The project was terminated in February 2012[1] but in October 2013 a contract was signed to complete the existing hull as a patrol ship by 2016.
On June 26, 2003, an annex to the original 2001 contract was signed, which abandoned the option for another six ships, which meant that the order was limited to only one vessel.
Lack of progress in construction due to insufficient financing resulted in the fact that in February 2012 the Prime Minister decided to close the Gawron corvette program in its entirety and sell the unfinished prototype.
In the same year, however, decisions were made to build a patrol unit with limited combat capabilities based on the ship's hull.
[7] A single existing Gawron hull will be completed without main armament as heavy patrol vessel at the cost of 100 million PLN.