MV Loch Portain

The new ferry was named MV Loch Portain on 23 April 2003 and undertook sea trials, before arriving in North Uist on 1 June.

[4] During January and February 2016, Loch Portain was fitted with a passenger lift and 2 MES evacuation systems, 1 port and 1 starboard, whilst dry docking in Birkenhead.

[4] A lack of depth in the Sound of Harris led to the adoption of a water-jet propulsion system, rather than the Voith Schneider units of the other Loch Class ferries.

[5] The shallow Sound of Harris is full of islands, sandbacks and rocks, and the route followed by the ferry covers nine nautical miles in an hour.

In October 2015, Loch Portain "made contact" with the sea bed in the Sound of Harris, resulting in a short spell in dry dock undergoing repairs.