[3][4] In January 2017 it was announced that the boring of the Bolaños tunnels along the Verín - Ourense section of the line was completed.
[5] The central part, which crosses some of Spain's most remote and fragile natural areas, was initially expected to open in 2018,[6][7] but has again been delayed to end 2021.
[12] The new trains suffered from technical problems during the initial months of service, resulting in rolling stock substitutions and delays.
[15] AVE trains initially ran between Madrid and Ourense with a maximum operating speed of 300 km/h (186 mph) to cover the distance in 2h 15min.
In addition Alvia services in the line on class 130 and 730 gauge-changing trains with a commercial speed of 250 km/h (155 mph), connect Madrid to Vigo, Pontevedra, Lugo and Ferrol.