Malpensa Express services to and from Milano Cadorna, operated by Trenord, continued to link the airport with the city.
[3] The new Malpensa Terminal 2 railway station is 200 metres north of the T2 arrivals hall, that is accessed by an outdoor covered walkway.
The running times of both services (Milano Centrale to Malpensa Airport Terminal 2) is about 57 minutes; they both have 2' class.
At Milano Centrale station, the Malpensa Express departs usually from tracks 1 or 2, and heads along the new railway section nicknamed the "Umbrella Handle" (opened on 31 July 2010, but not fully operational until 13 September 2010).
At Porta Garibaldi station, the Malpensa Express uses the new route (to the north of the old one), which crosses Farini yard.
It reaches PM Ghisolfa and leaves the RFI network to enter tracks 1 and 2 at Milano Bovisa station.