The overvalued cedi, shortages of hard-currency for raw materials and spare parts, and poor management in the state sector led to stagnation from 1970 to 1977 and then to a decline from 1977 to 1982.
Once the ERP began, the supply of foreign exchange for imported machinery and fuel substantially improved, and capacity utilization climbed steadily to about 40 percent in 1989.
The Akosombo Dam was the centerpiece of the Volta River Project (VRP), which the Nkrumah government envisioned as the key to developing an integrated aluminum industry based on the exploitation of Ghana's vast bauxite reserves and its hydroelectric potential.
The discovery of vast bauxite reserves in Australia and Brazil created a global oversupply of the mineral and induced a prolonged recession in the aluminum trade.
Under these conditions, Valco found it far more economical to import semi-processed alumina from Jamaica and South Korea than to rely on local supplies, despite the discovery in the early 1970s of sizable new deposits at Kibi.
[3] Severe drought compounded the effects of unfavorable market conditions by reducing the electricity generating capacity of the Akosombo Dam and by forcing a temporary shutdown of the smelter from 1983 to 1985.
Furthermore, the ERP's tight monetary policies created liquidity crises for manufacturers, while liberalization of trade meant that some enterprises could not compete with cheaper imports.
These policies hurt industries beset by long recession, hyperinflation, outmoded equipment, weak demand, and requirements that they pay 100 percent advances for their own inputs.
Committed to privatization and the rule of free market forces, the government was constrained from offering direct assistance or even from moderating some policies that had a detrimental impact on local manufacturers.
In 1991 the government established an office to deal with industrial distress in response to complaints that "unrestrained imports" of foreign products were undermining local enterprises.
Significant new enterprises included a US$8 million Taiwanese-owned factory, capable of turning out ten tons of iron and steel products per hour, which began trials at Tema in 1989.
[11] Mahindra vehicles are sold to state institutions, private organizations, industries, United Nations agencies and individuals in Ghana, on the Africa continent and around the world.
[13] The Apostle Safo Suaye Technology Research Centre (ASSTRC), confirmed that the local automobile assembly plant, will be ready in May, 2014.