Meizhou–Chaoshan high-speed railway

Meizhou–Chaoshan high-speed railway, a passenger-dedicated line (PDL), opened for revenue service on 11 October 2019, connecting two principal cities in Guangdong province, Meizhou and Chaoshan.

[1][2] The 122 km (76 mi) long railway has a design speed of 250 km/h (160 mph).

The line starts from a new Meizhou West railway station in the north, passes through Meizhou, Jieyang and Chaozhou connecting with Xiamen–Shenzhen railway and the Shantou line at Chaoshan.

[1][2] Meizhou–Chaoshan high-speed rail is a joint initiative of the China Railway Corporation and Guangdong Provincial Government, its construction required an estimated investment of 14.5 billion yuan.

[1][3] In September 2019 there were 20 arrivals and departures from Meizhou West railway station, the departures were:[4] Chaoshan railway station has a wider variety of trains and destinations being both the terminus of this line and an intermediate station on the Xiamen–Shenzhen railway.