Originally built for the Chicago, Burlington and Quincy Railroad, construction began in 1914 under the direction of engineer Ralph Modjeski.
In 1925, the Illinois Central Railroad purchased a 1/3 share of the Paducah and Illinois Railroad, and assumed operations and maintenance, as the bridge served as an important link in their newly completed Edgewood-Fulton Cutoff route.
As of 2013, the bridge is still owned by the Paducah and Illinois Railroad, with operations managed by Illinois Central Railroad successor Canadian National Railway and bridge maintenance/inspection managed by the BNSF Railway, where it continues to see heavy use.
This article about a specific rail bridge in the United States is a stub.
You can help Wikipedia by expanding it.This article about a bridge in Illinois is a stub.