Kakkad Hydro electric Project is the second stage development of Pamba river basin.
This scheme utilises the tail race water from Sabarigiri power station and flow received from Moozhiyar and Velluthode rivers.
The Moozhiyar Dam creates the main reservoir of this project.
[3] Taluks through which release flow are Ranni, Konni, Kozhencherry, Thiruvalla, Chengannur, Kuttanadu, Mavelikara and Karthikappally.
[4] Size of the Water Spread Area is 0.1457 km2 and the Full Reservoir Level (FRL) is at 192.63 m. Minimum Drawdown level (MDDL) is 181.36 m and Effective Storage at FRL is at 1.16 MCM[5] Sabari giri Power Station commissioned during 1966 -67 with six generators having vertical shaft pelton turbine as the prime mover.