[5][6][7] Construction of a third track between Mount Hope and Hyde Park took place in 1881–82, completing triple-tracking of the line between Boston and Readville.
[9] Ridership declined due to the competing #32 trolley line as well as the general disuse of railroads, but the station was never completely abandoned.
The MBTA offered instead a limited-service stop several hundred yards south at Cummins Highway, but local opinion was against the plan.
The 1945 Coolidge Commission Report recommended that an extension of the Orange Line south from Forest Hills be built to Dedham via West Roxbury rather than Mount Hope.
[11] The 1966 Program for Mass Transportation recommended a bifurcated Orange Line, with one branch to West Roxbury or Hersey and another to Readville or Route 128 via Mount Hope.
[12] Various reports over the next two decades continued to recommend various combinations of the extensions; however, due to cost, the 1987 relocation of the Orange Line to the Southwest Corridor was terminated at Forest Hills.
The extension was listed as low priority, due to environmental issues with crossing the wetlands south of Readville, and because the corridor already has commuter rail service.