It is run by the Tamil Nadu State Electricity Board.
The power plant is situated at the bottom of the Moyar Gorge and is accessed by a winch system from the plateau above.
[3]Moyar power house renovation 12MW to 14 MW of each unit from 2022 under construction by ANDRITZ india.
The elevation of the power station is 609 meters and the water source for the power house is from Moyar Forebay Dam, Maravakandy Dam, Pyakara Power House tail race and has a dam capacity of 446.25 Cusec.
You can help Wikipedia by expanding it.This article about an Indian power station is a stub.