In April 2007 a 2.2 km (1.4 mi) demonstration line was opened, built by the Tranvimur joint venture of Acciona and Grupo Cívica, along Avenida Juan Carlos I.
The trail was deemed successful in August 2008 and the rest of the system was built after a tendering process, which awarded a contract to Sociedad Concesionaria Tranvía de Murcia, a consortium of the companies COMSA EMTE Concesiones and FCC.
The tram then travels northward along Avenida Don Juan de Borbón, before branching off toward the Estadio Nueva Condomina, where it terminates.
The line travels has five stops and terminates at UCAM-Los Jerónimos station adjacent to the Universidad Católica San Antonio de Murcia.
The maintenance yard and depot is located directly adjacent to the La Ladera station.