Magras in Özlü in the Mut district of Mersin Province in southern Turkey.
[1] The farm is constructed on Mount Magras, a part of Toros Mountains range to the north of Mut district in Mersin Province.
Maximum power output of each turbine is 3 MW and the total annual energy production is about 100 MWh.
[2] The energy is fed to Gezende Dam situated about 25 km (16 mi) southwest of Mut wind farm.
The US$50 million project was carried out by Ağaoğlu Energy Group, and it is further planned to increase the number of turbines to 40.