Nehoiașu Hydro Power Plant

Nehoiaşu Hydro Power Plant is a large power plant on the Bâsca river situated in Romania.

The project was started in 1998 and it was made up by the construction of a dam with 8 mobile segments each 12 m (39 ft) high, which will be equipped with two vertical turbines, the hydropower plant having an installed capacity of 152 MW.

The power plant will generate 328 GWh of electricity per year.

This article about a Romanian building or structure is a stub.

You can help Wikipedia by expanding it.This article about a hydroelectric power plant is a stub.