In addition to the Hauptbahnhof, Rhine-Neckar S-Bahn services stop at Neustadt (Weinstr) Böbig halt (Haltepunkt).
Crossing the line to the west of the station is the German Wine Route (Deutsche Weinstraße), which winds through this area through an S-shaped curve.
It reaches Neustadt Hauptbahnhof over a drawn out S-curve, which takes it pass the freight facilities and Neustadt-Böbig halt.
Beyond the Hauptbahnhof, it runs to the west or northwest along the Speyerbach through the Palatinate Forest (Pfälzerwald) towards Saarbrücken, passing the suburbs of Afrikaviertel and Schöntal.
The narrow gauge Palatine Overland Railway (Pfälzer Oberlandbahn), which existed between 1912 and 1955, began in the station forecourt (Bahnhofsvorplatz) and crossed the standard-gauge tracks a bridge it shared with the German Wine Route and passed through several wine-growing villages to Landau.
However, it was agreed to first build a railway running east–west, which was to be used primarily for transporting coal from the Saar district (now part of the Saarland) to the Rhine.
On the platform were the state commissioner of Neustadt and some other subordinate officials; the president of the Palatinate region gave a speech.
[15] In January 1850, a brochure appeared in Neustadt (then called Neustadt an der Haardt) that promoted a route via Landau to Wissembourg (German: Weißenburg) and argued that the line should serve the larger townships rather than those immediately alongside the Rhine among other things.
The decision finally went in favour of a line through the hills in 1852, after reports and investigations had been launched the previous year.
On 3 November 1852, the Bavarian king, Maximilian II allowed its construction to proceed, by approving the creation of a joint-stock company that launched the project.
In 1860, a local committee promoted the construction of a railway from Neustadt an der Weinstraße via Bad Dürkheim to Frankenthal.
[17] The corresponding petition, however, met with no response since difficulties with the Palatine Ludwig Railway Company (Pfälzische Ludwigsbahn-Gesellschaft) were feared.
As a result of this project, the existing entrance building also had to be replaced, since the railway had gradually become congested and the station had to be extended.
It was extended to the Rhenish Hesse town of Monsheim on 20 July 1873 after the Grünstadt–Monsheim section had already been opened in March of the same year.
From 16 December 1912 onwards, the so-called Palatine Overland Railway (Pfälzer Oberlandbahn) ran from the station forecourt as an interurban, first as far as Edenkoben and from 13 January 1913 to Landau.
[26] After Germany had lost the war and the French military had marched in, the Maximilian Railway south of Maikammer-Kirrweiler was blockaded for passenger traffic on 1 December 1918, but it was reopened three days later.
[20] Since the main line from Mannheim had always had a great significance for long-distance traffic to Saarbrücken, it was gradually electrified, starting in 1960.
The electrification of the last section was delayed mainly because of the numerous tunnels between Kaiserslautern and Neustadt that had to be enlarged.
[29] The electrification work meant that this section was temporarily operated over only a single track and in one place trains could run at 40 km/h at most; as a result of the limited capacity several freight trains were directed over the Landau–Rohrbach railway and the Zeller Valley Railway (Zellertalbahn) towards Worms.
[34] The monument-protected entrance building, which was completed in 1866, together with its annexes, is built in the Neoclassical style in sections that are two and a half or three storeys high.
[5] In the eastern part of the station there has been a signal box since 1920 that was built with a decoration in the Heimatstil ("home style") that has the appearance of equestrian headwear.
The halt (Haltepunkt) of Neustadt (Weinstr) Böbig is, in addition to the platforms described above, another stop within the precincts of Neustädter Hauptbahnhof.
A locomotive shed with a total length of 80 metres, a turntable and a two-storey building, which functioned as a workshop and office, were opened with the commissioning of the Palatine Ludwig Railway between Ludwigshafen and Neustadt on 11 June 1847.
[40] After the completion of the Alsenz Valley Railway, the station also developed into a major intercity hub, giving the city an international reputation.
[42] A direct connection from Ludwigshafen to Alsace had emerged in 1876 in the form of the Schifferstadt–Wörth and Wörth–Strasbourg lines, but, because they were single-track, most of the long-distance trains from Frankfurt went via the Maximilian Railway and therefore always had to reverse in Neustadt with the locomotive running around.
[45][46] In the summer of 1914, the local traffic trains on the Alsenz Valley, instead of running to Kaiserslautern, ran on the Bad Münster–Neustadt route, requiring a reversal in Hochspeyer station.
There were not, with a few exceptions, direct services from Wissembourg, which was again the French border station, to Neustadt; instead a change in Landau was required.
[50] Since the original freight-handling facilities had become increasingly congested, the Palatinate Railway (Pfälzische Eisenbahnen) bought sites in 1881 in the "Gewitalwiesen" and "Hölzel" areas, in order to build a new freight yard there.