The first construction phase for the modernisation of Neuwied station was completed at the beginning of October 2011.

In addition, the stairs were renewed and new wall and floor coverings with an integrated blind guidance system were installed in the passenger subway.

In preparation for the second construction phase, the platform edge was raised to 55 cm in the area of the lift on the middle platform, which is faced by tracks 2 and 3, and the roof, which was in need of renovation, was replaced with modern roofing.

This conversion cost €1.7 million, which was paid for out of the economic stimulus package.

This redesign included:[10] In addition, a community centre now occupies part of the station building.