New Bong Escape Hydropower Project

[4][5] The project has been developed under Build-Own-Operate-Transfer (BOOT) basis, whereby it would be transferred to the Government of AJ&K free of cost at the end of a 25-year term.

The water to wire E&M equipment package has been supplied by a leading E&M supplier; Andritz Hydro under a subcontract with Sambu.

[6][7] Construction of the project was monitored by Owner’s Engineer consisting of joint venture of Montgomery Watson Harza (“MWH”) and National Engineering Services of Pakistan (“NESPAK”) while Mott MacDonald of UK are the Technical Advisors to the Financiers and were responsible for construction and environmental monitoring on their behalf.

Under the PPA, the hydrological risk is borne by the Power Purchaser through guaranteed payment for fixed costs like debt servicing, O&M, ROE and insurance.

[4] Energy generated through the four 21 MW low head high efficiency Kaplan Bulb turbines, housed in a semi submerged powerhouse complex, is evacuated through an in-out connecting arrangement with the double circuit 132 kVA Mangla/Kharian transmission line, which passes over the Project site.

[4] Pakistan's first Independent Hydropower Plant (IPP), it was awarded Middle East Renewable Deal of the Year 2009 by Euromoney.