Nickelodeon Slime Streak

[4] Construction was well under way throughout 2018/2019, and on February 2, 2019, American Dream officials held a press conference at the ACE EastCoaster event at Hersheypark in Hershey, Pennsylvania, where four of the park's coasters were revealed.

[citation needed] Nickelodeon Slime Streak began public operations on October 25, 2019 - the park's grand opening - with New Jersey Governor Phil Murphy and Triple Five President Don Ghermezian in attendance.

The ride passes directly overhead Timmy's Halfpipe Havoc, navigates a few smaller airtime bumps, and enters the brake run, thus returning to the station.

The train has received criticism from roller coaster enthusiasts and larger riders over its cramped, tight nature and thin, unpadded metal lap bar restraints.

[9] Nickelodeon Slime Streak was manufactured by Chance Rides in Wichita, Kansas,[10] and designed by rollercoaster engineer Joe Draves, who had also worked on projects such as Steel Curtain at Kennywood and Merlin's Mayhem at Dutch Wonderland.