Downtown Tunnel

[1] Any time you build a complex interchange in a downtown metropolitan area with an underwater tunnel and a bridge with a liftspan for river traffic, you have a real challenge.

Authorized by a revenue bond act passed earlier by the General Assembly, the commission decided during the 1946-47 fiscal year to construct toll bridges to replace ferry crossings on the York River at Yorktown and the Rappahannock River at [Grey’s Point] and to acquire from private owners the ferries that carried vehicles across Hampton Roads between the Norfolk and Lower Peninsula areas.

It was the first fixed crossing directly between Portsmouth and Norfolk across the Elizabeth River, predating the Hampton Roads Bridge Tunnel by five years.

After the lengthy review process required under the PPTA, then-Governor Bob McDonnell and VDOT executed the Comprehensive Agreement with ERC on December 5, 2011.

[15][16] Under the agreement, VDOT retains ownership and oversight of the tunnels, while ERC finances, builds, operates and maintains the facilities for a 58-year concession period.