Oshiwara is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India.
This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.
[2][3][4] Trial runs on section of 2A from Dahanukarwadi to Dahisar East has started from 31 May 2021.
Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.
Like all other stations and railways of Mumbai metro, Oshiwara station also uses 25,000 volt AC power system by overhead catenary to operate the trains.