It runs through the communities of Brown Deer, Mequon, Thiensville, Cedarburg, Grafton, Port Washington, Belgium, Cedar Grove, and Oostburg.
The trail is open to non-motorized pastimes, such as bicycling, rollerblading, cross-country skiing, jogging and birdwatching.
Subcommittees include Rules and Ordinance Development, Sustainability Committee, Trailside Facilities and Trail Promotions.
[2][3] A 415-foot bridge over Interstate 43 and County Highway W in the Town of Grafton was completed in late September 2009 at a cost of $1.76 million.
[4] Though it was expected to be built in the summer of 2006, the state Department of Transportation imposed design changes that boosted the cost of the bridge by $650,000.