Apart from changes to the boiler grates, the equipment remained in its original form until the station was decommissioned in 1969, when it was replaced by four submersible electric pumps.
A Trust was formed in 1974 to conserve the site as a static museum, but the plans soon developed to include the refurbishment and regular steaming of the engines.
New visitor facilities were built in 1991, and a major restoration of the structures was completed in 2005, following a grant of £1.6 million by the Heritage Lottery Fund.
In 1807, Thomas Hawksley, who went on to pioneer public water supply systems in the United Kingdom, was born at Arnold, near Nottingham.
His first action was to increase the supply of water, and so he sunk two wells at Papplewick, where Hawksley had already built a covered reservoir.
[5] They supplied steam at 50 psi (3.4 bar) to cylinders which are 46 inches (120 cm) in diameter and have a stroke of 7.5 feet (2.3 m).
[8] The buildings, which are grade II* listed structures and a scheduled ancient monument, were built in Gothic Revival style, and internally, the main engine house has outstanding cast iron fittings and stained glass.
Rather than the usual wooden laths to support the slates, they rest on angle irons, held in place by lead nails and 'torched' on the inside with mortar.
It was a huge brick-vaulted structure, with a brick building over the stairs, and a float tube to measure the water level, which was transmitted to Nottingham by telegraph.
Once volunteers started to maintain the site, the idea of steaming the engines was voiced, and a second organisation, the Papplewick Association, was created, with responsibility for operating the machinery.
The cooling pond was dry and had to be cleared of leaves and pine needles before refilling could begin on 12 July.
The boiler was lit on 18 September, and this time there were problems with smoke filling the smithy, which required further minor modifications.
Steam was raised on 20 September, and the first attempt to run one engine was made the following day, with John Thorlby, who had been superintendent of the pumping station until his retirement, demonstrating the start-up procedure.
The boiler feed-pump glands had to be repacked, and the camshaft had to be stripped down to clear the oil ways, but after attention to these items, the engine ran satisfactorily.
Construction of new visitor facilities, including a cafe and toilets, began in 1991, to a design by architects Cullen, Carter and Hill.
The Trust succeeded in obtaining a grant of £1.6 million from the Heritage Lottery Fund in 2002, which has enabled further development of the site to be undertaken.
[25] The Trust also runs a single-cylinder oil engine, which formerly generated power for the arc lights on the projector at Bolsover Cinema,[26] which is housed in the carriage shed and stables.