Pattabiram railway station

The lines at the station were electrified on 29 November 1979, with the electrification of the Chennai Central–Tiruvallur section.

These platforms are built to accumulate 24 coaches express train.

[2] In 2002, the railway department allotted ₹ 12 million for improving passenger amenities at the Pattabiram and Puliamangalam stations.

[3] A bridge connecting north bazaar with south bazaar over level crossing 10 at the Tiruvallur end of the railway station was inaugurated in 2010[4] and has a fleet of steps on either end for commuters to access the bridge.

[4] The residents are demanding that a road overbridge be built to replace the other level crossing.