Peter Wisoff

His technical assignments to date include: spacecraft communicator (CAPCOM) in Mission Control; flight software verification in the Shuttle Avionics Integration Laboratory (SAIL); coordinating flight crew equipment; evaluating extravehicular activity (EVA) equipment and techniques for the construction of Space Station; lead for the Payloads and Habitability Branch of the Astronaut Office.

Additionally, this mission featured the first flight of Spacehab, a commercially provided middeck augmentation module for the conduct of microgravity experiments.

Following 183 orbits of the Earth in 269 hours and 46 minutes, the eleven-day mission ended with Space Shuttle Endeavour landing at Edwards Air Force Base, California.

In five days of docked operations more than three tons of food, water, experiment equipment and samples were moved back and forth between the two spacecraft.

Following 160 orbits of the Earth in 244 hours, 55 minutes, the STS-81 mission concluded with a landing on Kennedy Space Center's Runway 33 ending a 3.9 million mile journey.

[1] STS-92 Discovery (October 11–24, 2000) was launched from the Kennedy Space Center, Florida and returned to land at Edwards Air Force Base, California.

During the 13-day flight, the seven member crew attached the Z1 Truss and Pressurized Mating Adapter 3 to the International Space Station using Discovery's robotic arm and performed four spacewalks to configure these elements.

Astronaut Peter Wisoff on the end of shuttle robot arm, 1993