There is a three-metre-wide (9.8 ft) road along the length of the tunnel for the maintenance of railway tracks and emergency relief.
It takes approximately 9 minutes and 30 seconds for the train to pass through the tunnel.
[4] The new Banihal-Qazigund tunnel for the Jammu–Baramulla line connecting Bichleri Valley of Banihal with Qazigund area of Kashmir Valley has been constructed as a part of its Udhampur-Srinagar-Baramulla rail link project.
[5] Banihal railway station is situated at 1,702 m (5,584 ft) above mean sea level.
The railway network in Kashmir from Banihal to Baramulla is now 137 kilometres (85 mi).