Prime Minister's Laptop Scheme

The program aimed at provision of laptops to deserving students studying in public and semi-public universities throughout Pakistan.

[2] The scheme was formally initiated on 23 May 2014, with the aim to award students attaining higher marks in public and semi-public universities with free laptops under the program.

Phase I of the scheme was based on the marks(or grades) obtained during(or cumulative up to) the academic year 2013-14.

[3] Phase II of the scheme was based on the marks 448 (or grades) C obtained during(or cumulative up to) the academic year 2014-2015.

The laptops distributed during Phase II were detachable with free Evo connectivity and sim enabled.