The Queensland – New South Wales Interconnector (QNI) is a 330 kV AC interconnection between New South Wales and Queensland, Australia.
It consisted of double-circuit 330 kV lines between Armidale, Dumaresq, Bulli Creek and Braemar and a double-circuit 275 kV line between Braemar and Tarong.
The original maximum transfer capacity was 300 to 350 MW in both directions.
[2] The interconnector is operated by TransGrid and Powerlink Queensland.
You can help Wikipedia by expanding it.This article about electric power is a stub.