Randenigala Dam

[1] Construction of the dam began in November 1982, and was completed in approximately 4 years.

[1] Three large controlled tainter gate chute spillways, with a combined discharge volume of 8,100 m3/s (290,000 cu ft/s), are constructed at the southern end of the dam.

With a catchment area of 2,330 km (1,450 mi) and a total storage capacity of 861,000,000 m3 (3.04×1010 cu ft), Randenigala is one of the largest reservoirs in the country.

[1] The power station is located immediately downstream of the dam, on the left bank.

[1] The plant consists of two generators with a rated capacity of 63 MW each, powered by two francis turbines.

The three large spillways of the dam.
The reservoir, as seen from 13km away in Harasbedda.
The power station of the Randenigala Dam.