Ranjiaba station

[1][2] It is located in Yubei District and serves its surrounding area, including nearby office towers, residential blocks and a mall.

These 2 platforms were designed with cross-platform interchange in mind and were built during the construction of Line 6.

Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.

There are 2 side platforms for Loop Line trains.

This article about a railway station in Chongqing is a stub.

Exit and transfer directories at a Loop Line platform
Transfer directories for cross-platform interchange and opposite direction trains of the Line 5/Line 6 island platform on B2