Rautaruukki, built by Hollming in Rauma, Finland, was delivered on 30 October 1986 and has since been used mainly to supply raw materials to the Raahe Steel Works.

Later Finnlines performed several feasibility studies which showed that a pusher-barge system would be the most economical and efficient method of transporting bulk cargoes on the relatively short routes of the Baltic Sea.

However, due to delays in negotiations Rautaruukki, concerned about the continuous supply of raw materials to the Raahe Steel Works, decided to order one pusher and two barges for itself and signed a building contract with Hollming on 29 September 1984.

[6] When the two pushers and five barges of the Finnpusku system entered service in 1986–1987, it was estimated that they would carry one third of the ten million tons of bulk cargo arriving in Finland by sea every year.

[2][3] In July 2003 a seven-year contract for the transportation of raw materials in the Baltic Sea was signed between JIT-Trans and Aspo Group.

[9] As part of the agreement, worth 140 million euros, the ownership and management of the Finnpusku system was transferred to ESL Shipping, a subsidiary of the Aspo Group.

[10] In February 2011 ESL Shipping signed a new long-term contract with Rautaruukki for the transportation of the raw materials of the steel industry in the Baltic Sea.

The pushers and barges of the Finnpusku system were docked at Arctech Helsinki Shipyard and modernized by STX Finland Lifecycle Services during the summer of 2011.

However, the low metacentric height of the pusher, only 0.5–0.6 m (1.6–2.0 ft), results in large roll amplitudes and pitching, making the vessel very uncomfortable in severe weather.

[15] Propulsion power is provided by two six-cylinder Sulzer 6ZAL40 4-stroke medium-speed diesel engines running on heavy fuel oil, manufactured under licence by Wärtsilä, each with a maximum continuous output of 3,840 kW (5,150 hp) at 380 rpm, giving the combination a service speed of 13.4 knots (24.8 km/h; 15.4 mph).

[16] Electricity is provided by two Wärtsilä-Vasa 4R22HF diesel engines, each producing 590 kW (791 hp) at 1,000 rpm, that are connected to 710 kVa Strömberg alternators.

Rautaruukki and Kalla outside Luleå , Sweden .
Rautaruukki and Tasku at Arctech Helsinki Shipyard on 26 June 2011.