This plan is part of a broader policy to reduce coal usage, enhance the use of liquefied natural gas (LNG), and transition towards a "nuclear-free homeland."
[6] A new law regarding greenhouse gas reduction and management act was ratified by the Legislative Yuan on 15 June 2015 and promulgated by President Ma Ying-jeou on 1 July 2015 to provide the government with legal basis for taking action against climate change.
The measures, ranging from inventory, registration, inspection, management, efficiency standards and cap and trade system, call for gradual, phased process with control targets every five years.
[7] President-elect Tsai Ing-wen said in January 2015 that her party aimed to phase out nuclear power in Taiwan by 2025 and to increase the share of renewable energy generation to 20% by that year.
[9] According to Minister of Economic Affairs Shen Jong-chin (沈榮津), the plan seeks to cover 100 percent of the construction costs of public solar power stations in remote and Aboriginal areas.
However, Taiwan's Bureau of Energy said Wednesday stated the government would only cover 50 percent of the costs "in remote areas.
In June 1995, Taipower and Water Resources Agency of the Ministry of Economic Affairs completed an investigation to determine the potential of hydro power in Taiwan.
The plant is located in Shuili Township, Nantou County with a capacity of 1,602 MW, acting as the pump-storage hydroelectricity source.
[18] In May 2009, Taiwan opened the National Stadium in Zuoying District, Kaohsiung which also acts as a photovoltaic power station.
[19] Currently Taipower is undergoing the first phase of photovoltaic project which will be completed by December 2014 with a total installed capacity of 19.6 MW and a production of 24.957 GWh per year.
There are currently 55 integrated and automated wind power forecasting systems established in Zhongtun, Kinmen, Mailiao, Changgong and Shihu.
[3][19] The first phase of wind power installation was done in January 2003 until December 2008 in which 59 wind turbines were put into commercial operations in Shinmen, Tatan Unit 1, Guanyuan, Shianshan, Port of Taichung, Taichung Power Plant and Hengchun with a total installed capacity of 96.96 MW.
The second phase was done in January 2005 until September 2011 in which 58 turbines were put into operation in Changgong Unit 1, Yunlin Mailiao, Sihu, Linko and Tatan Wind Power Stations.