It utilizes 413,280 panels on a single-axis tracking system across 202 hectares.
[2] It was jointly developed by ESCO Pacific and Palisade Investment Partners.
[2] The power station is expected to have an operating life of up to 40 years.
[2] A new 1.2km-long, 132 kV underground transmission line connects the power station to the grid and was laid by Powerlink Queensland.
You can help Wikipedia by expanding it.This article about a building or structure in Queensland is a stub.