SS Rebecca Lukens

The conversion added the shops to the Liberty ship, including machine, sheet metal, radiator, tank, wood, pattern, blue print, electrical, fabric and dope, paint, air-conditioned instrument and camera, radio, battery, propeller, tires and fuel cells, armament and turrets, plating, oxygen plant, radar, carburetor, and turbo-super-charger.

[8] The crew was given two weeks training in seamanship at the Grand Hotel in Point Clear, Alabama, on Mobile Bay.

[8] On 1 October 1944, Rebecca Lukens sailed from Brookley Field for the Pacific, commanded by Lieutenant Colonel William McCraw, USAAF.

[8] Between November 1944 and 1 September 1945, Major General Herbert A. Dargue supplied B-29s and P-51s with over 38,000 parts and units, ranging from spark plugs to the central fire controls for the B-29.

[8] On 2 March 1946, she was laid up in the National Defense Reserve Fleet, in the James River Group, in Lee Hall, Virginia.