The design was a 330 m (1,083 ft) twisting tower with more than 75 storeys for residential use, costing about US$140 million.
In response to this issue, the project was scaled back to 194 metres (636 ft) with 51 stories.
The concrete foundation raft for the building was poured about a year later in March 2007 by the Dubai Contracting Company and Ready Mix Beton.
[4] The old pouring record was also held by Ready Mix Beton.
[4] This United Arab Emirates structure article is a stub.