Sanyang Road station

Sanyang Road Station (simplified Chinese: 三阳路; traditional Chinese: 三陽路; pinyin: sān yáng lù) serves as an interchange station of Line 1 and Line 7 of Wuhan Metro.

The elevated station entered revenue service along with the completion of Line 1, Phase 1 on July 28, 2004, and the underground station entered service on October 1, 2018 with the opening of Line 7.

The station has two side platforms accommodating a pair of tracks, and is equipped with attended customer service concierges, automatic ticket vending machines, and accessible ramps.

The underground Line 7 station has a two side platforms and is connected to the elevated portion with two pairs of escalators, and a connecting bridge over the Sanyang Road intersection on both sides of the Jinghan Avenue.

There are sixteen exits in service: Bus transfers to Route 502, 534, 559, 581, 598, 608, 622, 711 and 801 are available at Sanyang Road Station.