About once a year in spring, the reservoir runs over into the spillway, generating massive whitewater down the cascades to the stilling basin that draws crowds of spectators for a few days.
The major prerequisite for the construction of the Sorpe Dam was the completion of the Röhrtal railway on 1 June 1900, a standard gauge Kleinbahn connecting Sundern to the Obere Ruhrtalbahn at Neheim-Hüsten.
In total, the steam trains carried more than 300,000 metric tonnes of construction material to the Sorpe dam, where smaller light railways took over.
The planners of the Operation had estimated that it would take 5 of the bouncing bombs placed correctly to weaken the dam sufficiently for water pressure to complete the break.
Private motor boats are prohibited on the reservoir to prevent oil spills and for maintaining a high drinking water quality.