It then runs eastwards to Scunthorpe and the Humber ports of Immingham and Grimsby, with the coastal resort of Cleethorpes as terminus.
After Barnetby railway station the line crosses the Lincolnshire Wolds passing quarries at Melton Ross and passes close to Humberside Airport near to where it diverges with the Barton Line and a branch which serves Immingham Docks close to Ulceby.
[3] This line is therefore a very important route for freight and extra capacity is needed to allow rail to grow with the port.
[4] The route from Doncaster to Immingham via Scunthorpe is a key artery for rail freight services conveying approximately 20% of the total rail freight volume moved in the UK, it includes:[5] Services on the Doncaster to Goole/Hull via Thorne line, which normally amount to eight trains per day, are also affected by these trains.
In 1916 the section of route between Wrawby and Brocklesby was quadrupled to cope with the growing amount of freight traffic heading for the docks at Immingham and Grimsby.
In April 2019, a level crossing over the line at Suggitt's Lane in Cleethorpes was closed due to safety concerns.